Commercial intent · India 2026
Sealix does not sell panels. We publish indicative market bands so you can spot a bad quote — then run your bill through the free check before you book an installer.
Indicative bands
City, structure height, cable run, and brand move quotes. Treat this as a map, not a Sealix invoice.
| Stage | Typical band (on-grid residential) | Notes |
|---|---|---|
| Gross turnkey quote | ≈ ₹1.6–2.4 lakh | Panels + inverter + structure + labour; GST as billed |
| Central CFA (eligible) | Up to ₹78,000 | PM Surya Ghar DBT after commissioning — not a shop cash discount |
| Indicative net | ≈ ₹80,000–1.6 lakh | Gross − CFA; state top-ups (if any) are extra and change often |
Hybrid / battery quotes are a different product and often far higher. Off-grid plants usually miss residential CFA. Confirm live CFA on pmsuryaghar.gov.in.
Central residential CFA commonly tops out at ₹78,000 for eligible 3 kW+. Going to 5 kW usually adds capacity without extra central CFA — see 5 kW price and 3 kW vs 5 kW.
A low gross quote on a ₹800/month bill is still a bad investment. A mid quote on a ₹3,000 slab bill can clear payback faster. Use the free home check and bill guides: ₹1,500 · ₹3,000.
PM Surya Ghar · Eligibility · Loans · Costs & savings · About Sealix.