RWA · managing committee
If you searched “society NOC for solar” or “NOC format”, start here. DISCOM net metering and PM Surya Ghar often need written RWA approval when the roof is shared. Copy-ready template below — practical framing, not legal advice.
Last reviewed
Fast triage: Jump to the copy-ready society NOC template and fields DISCOMs check. Top rejections: single signature + no resolution number. Flat vs RWA plant economics: apartment solar · sharing credits: virtual net metering.
Disclaimer: Sealix Energies is not a law firm. Society bye-laws, state cooperative acts, and RERA orders differ by building and city. Use this as a homeowner checklist; confirm specifics with your society’s auditor or advocate if disputes arise.
Start with a free bill check so you know whether solar is worth the NOC effort before you petition the committee.
Managing committees are liable for common property. Their questions are predictable:
Address these upfront and NOC meetings go faster than leading with “government subsidy.”
| Track | Who applies | Typical committee ask |
|---|---|---|
| Individual flat (private terrace rights) | Flat owner on own domestic meter | Written NOC, structural OK, indemnity for waterproofing |
| RWA common-area plant | Society / association entity | AGM resolution, vendor contract, benefit-sharing policy, larger load certificate |
Context for flats vs bungalows: apartment rooftop solar guide.
Subsidy framing: PM Surya Ghar guide. Equipment compliance: ALMM & DCR panels.
Many DISCOMs (including several in Maharashtra, Karnataka, Telangana, and NCR) ask for society NOC upload during net-meter application or commissioning inspection. PM Surya Ghar may reject CFA if roof-rights documents do not match the applicant name. Sequence matters: NOC → feasibility → install → inspection → CFA DBT, not the reverse.
There is no single national format. Unless your DISCOM publishes its own form, a NOC on society letterhead with the fields below is what portal and DISCOM desks look for. Print on letterhead; fill every blank; do not leave “[ ]” brackets in the final copy.
[Society name] · Regn. No. [ ] · [Registered address]
Ref: NOC/SOLAR/[year]/[serial] · Date: [DD-MM-YYYY]
To: The Assistant / Executive Engineer, [DISCOM name], [sub-division]
Subject: No Objection Certificate for installation of grid-connected rooftop solar system — Flat [No.], [Wing / Block]
This is to certify that [Society name] has no objection to [Applicant full name, as on electricity bill], owner of Flat No. [ ], [Wing / Block], electricity consumer no. [ ], installing a grid-connected rooftop solar PV system of [x] kW on approximately [x] sq ft of the terrace, in the area marked on the attached layout, under PM Surya Ghar: Muft Bijli Yojana and the net-metering arrangement of [DISCOM name].
This permission was approved by the [Managing Committee / General Body] by Resolution No. [ ] dated [DD-MM-YYYY]; a certified copy is enclosed.
The society also permits:
Conditions: the applicant bears the cost of any waterproofing or structural repair caused by the installation; the society is not liable for generation or subsidy outcomes; the system will be removed at the applicant’s cost if [condition, e.g. terrace reconstruction].
This NOC is valid for [24] months from the date of issue, or until commissioning and subsidy release, whichever is later.
[Signature] Chairman — [name] [Signature] Secretary — [name] [Society stamp on both]
Enclosures: certified copy of Resolution No. [ ]; terrace layout marked with the allotted area.
Practical template, not legal advice. If your DISCOM has its own NOC form, use theirs.
“Resolved that the society grants no objection to [name], owner of Flat [No.], to install a [x] kW rooftop solar system on about [x] sq ft of the terrace as per the layout tabled, subject to the conditions in the NOC; and that the Chairman and Secretary are authorised to sign the NOC and any DISCOM / PM Surya Ghar documents in this regard.” Record who proposed, who seconded, and the vote.
Keep a PDF scan ready with your documents pack. Other upload errors: application mistakes.
Apartment & flat solar · 10 kW price · Net metering India · Areas · Mumbai · Pune.
When the roof is common property or society bylaws require committee approval, yes — practical installs almost always need written NOC before DISCOM feasibility and PM Surya Ghar commissioning. Requirements vary by state RERA, society bye-laws, and DISCOM forms.
Common requests: structural load certificate, vendor empanelment proof, panel layout drawing, waterproofing warranty, insurance/indemnity clause, cable routing plan, and draft NOC on society letterhead signed by secretary and president.
There is no single national format. The portal and DISCOMs accept a NOC on society letterhead that names the applicant and flat as on the electricity bill, states the solar capacity in kW and the terrace area allotted, quotes the committee or AGM resolution number and date, permits cable routing and maintenance access, and is signed by two office-bearers (usually chairman and secretary) with the society stamp. Some DISCOMs publish their own form — if yours does, use it.
Informal committee review can take 2–6 weeks; AGM-backed resolutions may wait until the next quarterly meeting. Budget 1–3 months for society steps in contentious buildings, before DISCOM and install timelines.
Sizing for a flat or society roof: 2 kW price · how many panels for 3 kW · on-grid vs off-grid vs hybrid · solar battery price · load enhancement
FAQ
Depends on bye-laws, ownership rights, and state housing rules. Some top-floor owners with exclusive terrace rights have challenged blanket bans — but litigation is slow and expensive. Negotiation with structural proof is usually faster. This is not legal advice; consult local counsel if blocked unfairly.
Not unless the resolution says so. Standard individual NOC grants permission to install on common roof area allocated to your flat — ownership stays with you. Read the NOC text before signing.
Treat informal chat as progress, not proof. DISCOM and subsidy audits want signed letterhead NOC or registered AGM minutes. Follow up in writing.