National scheme · MNRE
Central financial assistance for residential rooftop solar, paid to your bank after commissioning. Sealix helps you see if your bill justifies the net cost — then you apply on the official portal.
Central CFA is commonly ₹30,000 for 1 kW, ₹60,000 for 2 kW, and a maximum of ₹78,000 for eligible 3 kW and larger residential rooftop systems. Confirm live amounts on pmsuryaghar.gov.in.
No. The scheme reduces cost via Direct Benefit Transfer after commissioning. You still pay the balance to an empanelled vendor. Some districts may run separate special packages — do not assume zero rupees.
Apply only on the official national portal pmsuryaghar.gov.in. Sealix is not the government portal; we help you judge bill fit first.
No. You pay the installer the full agreed amount and the central assistance is transferred to your bank account afterwards, once the system is commissioned and the paperwork is accepted. This means you need the whole amount available up front rather than the net figure. Treat an offer to adjust the subsidy in the invoice today with caution, and ask what happens if the claim is later reduced or rejected.
Registration is quick but everything after it runs at the pace of a queue: feasibility approval, vendor selection, installation, inspection, net-meter fitting and commissioning, with the transfer following acceptance of commissioning. Realistically expect weeks to a few months, varying by state and local office workload. Anyone promising installation this week and subsidy next week is not describing this scheme.
Most delays are mismatches or steps taken out of order rather than problems with the subsidy. The frequent causes are selecting the wrong distribution company, a name that differs between the electricity connection, Aadhaar and bank records, bank details that cannot receive a transfer, installing before the approval your state requires, using a vendor who is not empanelled or equipment that does not meet the applicable requirements, applying for capacity above your sanctioned load, and undocumented roof rights on a shared terrace.
No. Assistance rises to 3 kW and then stops, so a 5 kW system receives the same maximum as a 3 kW one and every kilowatt beyond the third is paid at full price. Going larger is justified by genuinely high consumption, not by available roof space, particularly since surplus units exported are settled at less than the retail tariff you pay.
Usually not directly. A plant on a shared terrace is normally connected to the society's common meter, so it offsets lifts, pumps and common lighting and reduces the maintenance charge everyone contributes to, rather than any individual flat's bill. Provisions for group housing also differ from the individual residential bands, so check current portal wording rather than applying household figures.
CFA amounts
Figures below are the widely published PM Surya Ghar residential CFA bands. Rules and portal wording can change — always confirm on pmsuryaghar.gov.in before you decide.
| System size | Central subsidy | How it stacks |
|---|---|---|
| 1 kW | ₹30,000 | ₹30,000 per kW for the first 2 kW |
| 2 kW | ₹60,000 | Full amount for 2 kW |
| 3 kW or more | ₹78,000 max | ₹60,000 for first 2 kW + ₹18,000 for the 3rd kW; no extra CFA beyond 3 kW |
State or district top-ups (if any) are separate from this central CFA. Group housing / RWA common-area rules differ from individual homes — check the portal, not a brochure.
Last reviewed
Usually outside this CFA path: commercial and industrial meters, tenants without the owner’s involvement, and anyone installing before DISCOM feasibility when the portal requires approval first.
Sealix does not collect Aadhaar on this website. KYC stays on the official portal and with your chosen empanelled vendor.
Timelines vary widely by DISCOM queue. Expect weeks to a few months end-to-end, not “install tomorrow, subsidy today.”
This is the single most common and most expensive misunderstanding about the scheme, so it is worth stating plainly: you pay the installer the full agreed amount, and the central assistance reaches you afterwards as a Direct Benefit Transfer into your bank account once the plant is commissioned and the paperwork is accepted.
Two consequences follow, and both need planning for.
First, you need the whole amount available up front, not the net figure. A household budgeting only the post-subsidy cost discovers at payment time that it is short by ₹78,000 — money that will arrive, but not yet. If that gap is a problem, arrange it deliberately rather than in a hurry: see rooftop solar loans in India.
Second, treat any offer to "adjust the subsidy in the bill today" with real caution. A vendor who deducts the assistance from your invoice is either carrying the risk on your behalf, in which case ask exactly what happens if the claim is later reduced or rejected, or is not describing the scheme accurately. The portal-tracked route pays you, which is precisely what keeps you in control if something goes wrong.
Delay is rarely caused by the subsidy itself. It is almost always a mismatch or a step taken out of order, and nearly all of it is avoidable if you check before applying rather than after. Two of the causes below are decided by whom you hire, which is why vendor registration and equipment listing are worth verifying yourself first — see choosing an installer. If you cannot get past registration or login at all, the specific causes are in portal login problems.
An hour spent checking your bill, your name records and your bank details before applying saves considerably more than an hour later.
Assistance rises to 3 kW and then stops. A 4 kW or 5 kW system receives the same ₹78,000 as a 3 kW one, so every additional kilowatt beyond the third is paid at full price. In effect the marginal cost per kilowatt jumps once you cross that line, even though the average cost per kilowatt keeps looking reasonable.
That is why so many well-advised households land at exactly 3 kW. Going larger is justified when your consumption genuinely needs it — a big daytime load, air-conditioning across several rooms, an electric vehicle — and not merely because the roof has space. Two further points argue for restraint: a unit you consume as it is generated avoids your full retail tariff, while a surplus unit exported settles for less under the tariff order in force at commissioning (net metering in India); and a larger array still draws no more assistance. The comparison is worked through in 3 kW vs 5 kW, with indicative pricing in 3 kW price and 5 kW price.
Size from twelve months of bills. A vendor proposing a capacity before asking to see your consumption is selling hardware rather than giving advice.
The residential bands above are written for an individual household with its own connection and its own roof. A multi-storey building is a different case, and conflating the two causes real disappointment.
Where a plant is installed on a shared terrace, it is normally connected to the society's common meter. It then offsets lifts, pumps, common lighting and water pumping — reducing the maintenance charge everyone contributes to, rather than the bill for any individual flat. That can be a sound collective investment, because common-area load is steady and largely daytime, which suits solar well. But a resident expecting their own bill to fall has misunderstood what was bought.
Provisions for group housing and common facilities differ from the individual residential bands, so check current portal wording rather than applying the household figures. Practical detail is in apartment rooftop solar, and tenants should start with solar for tenants, since the connection holder and the roof owner both matter.
Registration and application are quick. Everything after that runs at the pace of a queue. Feasibility, vendor selection, installation, inspection, net-meter fitting and commissioning each take their own time, and the assistance is transferred only after commissioning is accepted.
Realistically this is a matter of weeks to a few months, varying considerably by state and by local office workload — not days. Anyone promising installation this week and subsidy next week is describing something other than this scheme. Plan around the sequence, keep your own copies of every uploaded document, and note that state-level top-ups, where they exist, are assessed against the rules in force at commissioning rather than at application — see state top-up subsidies.
We are an independent advisory layer for homeowners: subsidy framing, savings logic, and payback from your bill. We are not the government, and we do not claim to be your installer. Partners visit only if the numbers make sense. For AP & Telangana DISCOM notes see also our subsidy page; for cities see areas.
FAQ
The branding emphasises free or near-free units after a subsidised plant is running — not a guarantee of zero-rupee hardware for every applicant. You still fund the net cost after CFA.
Prefer portal-tracked DBT after commissioning. Treat “we’ll adjust subsidy in cash today” pitches with caution; verify vendor empanelment on the official lists.
No. Many homes rely on central CFA alone. Maharashtra, Karnataka, AP, Telangana and others may announce pilots or top-ups — check state energy / DISCOM notices, then still run your bill maths.
No — you pay the full agreed amount and the assistance reaches your bank account after commissioning. Budget the gross figure, not the net one, and see rooftop solar loans if that gap needs bridging.
No. Assistance stops rising at 3 kW, so a 5 kW plant draws the same maximum and the extra capacity is paid at full price. Compare in 3 kW vs 5 kW.
Usually not. It normally feeds the society's common meter, reducing maintenance charges rather than individual bills — see apartment rooftop solar.