Torrent Power · Ahmedabad · Gandhinagar · SuratFree home savings check

DISCOM guide · Gujarat

Torrent Power rooftop solar (2026): from application to net meter

Torrent Power is the private licensee for Ahmedabad, Gandhinagar and Surat city. Its homes use the same SURYA Gujarat portal and get the same central subsidy as GUVNL homes, but the field work runs through Torrent's own desks, estimate and meters. Here is each step, who does it, and where files usually wait.

Last reviewed

Fast triage: If your bill says Torrent Power, your empanelled vendor applies for you on the SURYA Gujarat portal. Homes cannot apply offline. Subsidy: ₹78,000 central for 3 kW; we could not verify a state top-up. Torrent supplies the net meter; the solar meter comes through the Torrent estimate. Check your bill first.

Torrent or GUVNL: who bills you

CityTorrent PowerOutside Torrent's area
AhmedabadCity licence areaUGVCL in the outskirts and north
GandhinagarCity licence areaUGVCL
SuratMuch of the city core, including many Varachha, Adajan and Athwa homesDGVCL in the periphery and rest of south Gujarat
DahejLicence area (mostly industrial)DGVCL

Picking the wrong company sends the file to the wrong desk. Read the bill header, not your pin code. City detail: Ahmedabad · Surat. Every other Gujarat DISCOM is covered on the Gujarat hub.

The steps for a Torrent home

Torrent's published procedure for private residential customers, in order:

  1. Vendor applies. An empanelled vendor submits your application on the GUVNL unified (SURYA Gujarat) portal. Pick the vendor from the portal's installer list; homes cannot apply without one.
  2. Torrent checks documents and, once they are in order, sends the vendor to pay the solar estimate on the Torrent portal.
  3. Registration. After payment, Torrent registers the application on the unified portal and in its own office, and issues a registration letter to you (copy to the vendor).
  4. Feasibility approval by Torrent's team, declared on the GUVNL portal.
  5. Documents at the Torrent office: the vendor submits the portal documents and a cancelled cheque. Torrent's FAQ also lists a connectivity agreement, plus terrace rights and a CEI drawing approval where needed (see the note below).
  6. Installation by the vendor.
  7. Meter box installed by Torrent.
  8. CEI inspection report or self-certification submitted by the vendor at the Torrent office.
  9. Meters: Torrent fits the import-export (net) meter and the solar meter.
  10. Commissioning reported: Torrent informs GUVNL online, which unlocks the subsidy stage. Then redeem it on pmsuryaghar.gov.in with your bank details.

About the agreement: under GERC's fifth net-metering amendment (2025), PM Surya Ghar homes are treated as bound by the regulations from the commissioning date, with no separate written connectivity agreement. Torrent's older FAQ still lists one. If your file is held for an agreement, ask the zone office whether it is still required for a PM Surya Ghar home.

Subsidy

SystemCentral (PM Surya Ghar)
1 kW₹30,000
2 kW₹60,000
3 kW and above₹78,000 (cap)

The subsidy is paid into your bank account after commissioning. On SURYA Gujarat, the usual practice is that you pay the vendor the price net of subsidy, so read the quote carefully: it should show the full price, the subsidy and what you pay. Older Surya Gujarat state-subsidy resolutions are still online, but we found no current state top-up for general homes, so treat any "state subsidy" line as upside until it appears on your application. Compare: state top-up subsidies.

Meters and the Torrent estimate

Non-residential customers pay for all meters themselves and apply offline through GEDA, so a shop or office on the same building follows a different route.

Tracking and stuck files

Track on SURYA Gujarat's Track application page with your application number, consumer number and mobile number. You can also upload the receipt for the payment made to the installer there. Where the portal's own FAQ points:

Torrent lists zone-wise places to submit solar documents on its customer portal's solar guide, so use the zone office for your address.

Is it worth it on a Torrent bill?

Gujarat has some of India's best sun, so a 3 kW plant in Ahmedabad or Surat typically makes 350–400 units a month. Homes with an AC and a bill of ₹2,500 or more usually recover the post-subsidy cost fastest; under about 150 units a month, payback stretches. Exported units are settled under the tariff order in force when you commission and are worth less than units you use. Sizing: 3 kW vs 5 kW · prices: 3 kW · 5 kW.

What Sealix is

An independent advisory: not Torrent Power, not GUVNL and not an installer. We don't file applications or sell panels. We read your bill and tell you whether rooftop solar pays: free bill check for Gujarat homes.

Common questions

How do Torrent Power customers apply for rooftop solar?

Residential Torrent Power customers apply online through an empanelled vendor on the GUVNL SURYA Gujarat unified portal; there is no separate offline route for homes. Torrent checks the documents, asks the vendor to pay the solar estimate on the Torrent portal, registers the application, gives feasibility approval, and after installation fits the import-export meter and solar meter and reports commissioning to GUVNL.

Do Torrent Power homes get the PM Surya Ghar subsidy?

Yes. Torrent Power domestic consumers in Ahmedabad, Gandhinagar and Surat get the same central PM Surya Ghar subsidy as GUVNL consumers: ₹30,000 for 1 kW, ₹60,000 for 2 kW and ₹78,000 for 3 kW or more, paid to your bank account after commissioning. We could not verify a current Gujarat state top-up for general homes.

Who pays for the meters on a Torrent Power solar connection?

For residential customers Torrent provides the net (import-export) meter. The solar generation meter is charged through the solar estimate, which the empanelled vendor pays on the Torrent portal and normally passes on in your quote. Ask the vendor to show the Torrent estimate as a separate line.

Am I a Torrent Power or a GUVNL customer?

Check the company name on your bill. Torrent Power supplies the Ahmedabad and Gandhinagar city licence areas, Surat city and Dahej. Homes outside those areas are billed by a GUVNL company: UGVCL in north Gujarat including Ahmedabad's outskirts, DGVCL around Surat and south Gujarat, MGVCL in central Gujarat and PGVCL in Saurashtra and Kutch.

Related: Gujarat hub · Ahmedabad · Surat · State top-up subsidies · Net metering India · How to apply

Check my Gujarat bill