Andhra Pradesh · solar subsidy 2026
Free 2 kW for eligible SC/ST homes, ₹20,000 extra for BC, central CFA up to ₹78,000 for everyone else — and three DISCOMs that will stall your file if you pick the wrong one. Your bill still decides whether buying is worth it.
Last reviewed
Fast triage: SC/ST home on up to 200 units a month? The state can install a 2 kW system free. BC? ₹20,000 extra is promised. Everyone else: up to ₹78,000 central. Vijayawada, Guntur and Ongole bills say APCPDCL, not APSPDCL. Monthly bill under ~₹1,000 and not on a free-plant route? Usually wait. Money page: solar subsidy in Andhra Pradesh · Subsidy table · is solar worth it? · check your bill.
Rooftop solar in Andhra Pradesh is a good decision for a lot of households and a poor one for plenty of others, and the difference is usually visible on the electricity bill before anyone climbs onto the roof. This page covers the state subsidy by category, which distribution company handles your application, and how the solar resource differs between coastal and Rayalaseema districts — then points you to city pages. For SC/ST and BC deep detail: AP SC/ST/BC scheme · all-India SC/ST map: SC/ST solar subsidy by state.
| Your situation | Verdict | Why |
|---|---|---|
| SC/ST, ≤200 units/month, DISCOM free-plant list | Take the free 2 kW route | You do not buy a plant; DISCOM owns it and pays roof rent — different from a privately owned CFA plant |
| BC on low units, DISCOM registration open | Confirm ₹20k top-up then size carefully | State amount is real only if your DISCOM registers you; do not sign a quote that assumes it without proof |
| General category, bill under ~₹1,000/month | Usually wait | CFA cannot invent savings on a thin bill — see worth-it bands |
| General category, bill ~₹2,500+/month, clear roof | Usually yes after CFA | High-slab units disappear first; 3 kW often hits the ₹78,000 CFA ceiling |
| Shared terrace, no society NOC | Fix paperwork first | Commissioning stalls here more often than on DISCOM feasibility — society NOC guide |
A national subsidy application asks you to select your DISCOM, and in Andhra Pradesh that is a genuine decision rather than a formality. The state is divided between:
Do not infer which one serves you from a map or from what a neighbour says. Read the header of your own electricity bill. Selecting the wrong company on the portal is one of the most common reasons an application sits unprocessed, and it is entirely avoidable. Feasibility handling, inspection scheduling and net-meter installation are then managed by that company's local section office, so timelines differ somewhat between the three.
Our DISCOM-specific walkthrough for the southern company is the APSPDCL rooftop solar guide.
Applications for residential rooftop solar go through pmsuryaghar.gov.in. Central assistance commonly runs ₹30,000 for 1 kW, ₹60,000 for 2 kW, and up to ₹78,000 for eligible systems of 3 kW and above. Above 3 kW the central figure stops rising, which is why so many household systems in the state are sized at exactly that point.
Two clarifications save people a lot of frustration. First, the money is transferred to your bank account after commissioning — it is not a discount applied at purchase, so you finance the full cost initially. Second, Sealix adds no subsidy of its own; the state support that does exist is set out below.
| Household | What AP adds | How it is delivered |
|---|---|---|
| SC / ST (up to 200 units/month) | Free 2 kW system — the state pays the balance after ₹60,000 central CFA | DISCOM-led “Utility-Led Aggregation” with DISCOM-appointed vendors. The DISCOM owns the plant and the government pays ₹1 per sq ft a month roof rent. You do not pick your own installer |
| BC | ₹20,000 extra state subsidy: ₹80,000 for 2 kW, ₹98,000 for 3 kW (vs ₹78,000) | 2026 reports: DISCOMs surveying and registering BC homes on up to 200 units for 2 kW, with a bank loan for the balance. Confirm with your DISCOM before counting it |
| OC / general | None — central CFA only (up to ₹78,000) | Apply yourself on pmsuryaghar.gov.in with an empanelled vendor |
Scale: the state targets 5,99,105 SC/ST systems (about 1,198 MW); 2,27,549 were installed by 4 August 2026, with APSPDCL furthest ahead at 47%. Across all categories AP has received 9,04,508 PM Surya Ghar applications, with 2,66,417 systems installed and ₹1,512.61 crore of central CFA released as of 31 July 2026 (Lok Sabha answer). If a vendor quotes you a state amount outside this table, ask to see the official notice. How each route works, who owns the plant and what to do: AP solar scheme for SC, ST and BC homes. The mechanics are set out in the PM Surya Ghar guide, with eligibility conditions in eligibility and the application steps in how to apply.
Andhra Pradesh is often described as uniformly sunny. In practice the state contains two distinct environments, and they call for different expectations and different hardware.
The coastal belt — from Srikakulam down through Visakhapatnam, the Godavari and Krishna districts, and on to Nellore — receives rain from both the south-west and north-east monsoons, so cloudy spells trim the annual total. Humidity and salt in the air near the shore also attack mounting structures, fasteners and inverter enclosures, which makes galvanising quality and hardware placement a real specification issue rather than a detail. Cyclone exposure along this coast makes structural wind rating more important than inland.
Rayalaseema — Ananthapur, Kadapa, and the drier interior — has a notably stronger solar resource, with long clear spells and low rainfall. The trade-off is heat and dust. Panel output falls as cell temperature rises, and in a district with little rain there is nothing to rinse dust off the glass, so cleaning becomes a planned activity rather than an optional one.
The practical result is that a 3 kW system in Ananthapur will typically out-generate the same system in a coastal district — while a coastal home on a higher tariff slab may still see faster payback. Generation and savings are related but not the same thing.
Gather twelve months of bills, not the latest one. Andhra summers drive cooling load hard, so a single May bill overstates your annual consumption and invites an oversized quotation. From the bills, note three things:
Grid-tied systems also need a bi-directional net meter from your DISCOM, with export settled under the tariff order in force at commissioning. Exported units are generally worth less to you than units you consume directly, which is a strong argument against oversizing. See net metering in India.
Local roof types, shading, corrosion risk and service reach vary more than the state-level picture suggests. Detailed pages: Visakhapatnam · Vijayawada · Nellore · Tirupati · Ongole · Kadapa · Ananthapur.
Most mid-bill homes across the state land at 3 kW, because that is where central assistance stops increasing — every kilowatt beyond it is paid at full price. 3 kW vs 5 kW explains when the larger system is genuinely justified and when it simply exports cheap units.
We advise against buying when the domestic bill sits below roughly ₹1,000 a month, when the terrace is shared without a documented society NOC, when roof rights are unsettled, or when the property may be sold within a couple of years. Tenants, agricultural connections and commercial loads fall outside this guidance. Sealix is not a DISCOM, not a government body and not an installer — we read your bill, give an honest verdict, and introduce a certified partner only when the numbers support it.
Telangana · Telangana subsidy · Tamil Nadu · APSPDCL · APCPDCL · APEPDCL · Is solar worth it? · Subsidy not received? · Costs & savings · All areas.
Whichever one is printed on your electricity bill. Andhra Pradesh is served by three distribution companies: APSPDCL in the southern districts (Nellore, Tirupati, Chittoor, Kadapa, Ananthapur, Kurnool), APEPDCL in the northern and eastern coastal districts (Visakhapatnam), and APCPDCL in the Krishna, Guntur and Prakasam belt (Vijayawada, Guntur, Ongole). Selecting the wrong company on the national portal stalls the application, so read the bill header rather than assuming.
Depends on your category. SC and ST households using up to 200 units a month can get a free 2 kW system, with the state paying the balance after ₹60,000 central assistance, delivered by the DISCOM through a utility-led aggregation model. The DISCOM owns that plant and the government pays the family roof rent. BC households get ₹20,000 extra (₹80,000 for 2 kW, ₹98,000 for 3 kW), with DISCOM registration under way in 2026. Other households get central assistance only: ₹30,000 for 1 kW, ₹60,000 for 2 kW, up to ₹78,000 for 3 kW and above. Sealix adds no subsidy of its own. Full table.
Rayalaseema districts such as Ananthapur and Kadapa generally have a stronger solar resource with clearer skies and lower rainfall, while coastal districts see more cloud from both monsoons plus salt-air corrosion. Rayalaseema tends to generate more per kilowatt, but coastal homes with higher bills can still pay back faster. The bill matters as much as the sunshine.
Below roughly Rs 1,000 a month on a domestic connection, the net cost after subsidy is difficult to justify anywhere in the state. From about Rs 1,500 upward the higher tariff slabs improve the case substantially, because rooftop solar removes your most expensive units first. Full India bands: is solar worth it?
Yes, for eligible SC and ST domestic consumers using up to 200 units a month: the state can install a 2 kW plant at no cost under a utility-led model. The DISCOM owns the plant and pays roof rent. That is different from buying your own plant and claiming central CFA. How it works: AP SC/ST/BC scheme · other states: SC/ST subsidy map.
Expect weeks to a few months depending on DISCOM feasibility, vendor slots, inspection and net-meter appointment. Wrong DISCOM on the national portal is the most common self-inflicted stall. If money has not arrived after commissioning, use subsidy status / not received.
Sizing and cost: 2 kW price · how many panels for 3 kW · on-grid vs off-grid vs hybrid · solar battery price · load enhancement